The Data Privacy Impact Assessment Template Tool helps you conduct, manage and track risks for your DPIA in a more complete all in one solution. Includes 38 controls with mapping to GDPR, NIST and CCPA/CPRA, a risk snapshot dashboard, timesaving dropdowns and date generation features and gantt chart risk remediation tracking.
Data Privacy Impact Assessment Template Tool
1.204,00 €
View Count Today: 20
Description
This Data Privacy Impact Assessment Template Tool allows you to conduct and manage every aspect of the DPIA process using a 5 part DPIA management system. This system is executed via a highly automated workbook which delivers risk mapping, tracking, monitoring and reporting in an efficient way.
Key functions include:
- 38 assessment controls with mapping to GDPR, CCPA/CPRA & NIST
- Color coded risk classifications based on an industry standard 4×4 risk matrix
- Risk tracking features using various status fields and automated gantt chart tracking for enhanced risk remediation tracking.
- Highly automated risk dashboard with risk status metrics such as number of risks by category, tasks overdue and aged risk report.
- A customizable drop down worksheet where you can change values to suit.
- Sample sheets to show you how a completed DPIA looks.
- Unrestricted VBA codebase so you can modify code to suit.
What Problem does it Solve?
Existing ways of performing a privacy impact assessment usually involve a bare bones worksheet for which there are no meaningful metrics, no mapping to privacy standards, no risk tracking capabilities or automation capabilities.
This means that your DPIA process is taking longer than it should and not maximizing the usefulness of the risk data your generating.
It also means that your likely having to use multiple spreadsheets or tools to handle the necessary data to assess, assign tasks and track progress.
WHAT’S INCLUDED
1) DPIA Workbook with aforementioned features.
2) We offer a free remote consultation / product walkthrough after purchase to discuss features, implementation & individual requirements.
3) Four hours of support for troubleshooting / product customization if needed.
PRODUCT QUESTIONS?
[email protected]
TECH SPECS
Macro enabled spreadsheet built for Excel 2016 or greater.
To enable the macro features, right click on the file after download
and click trust macro enabled spreadsheet.
ABOUT THIS PRODUCTS DEVELOPMENT
This product’s development time was about 170 hours. This included VBA coding, compliance code mapping, worksheet design and chart design by a small team of professionals.
DPO SOLUTIONS SOCIALS
YouTube Like, subscribe and get notified / @dposolutions.training
Follow us Facebook https://www.facebook.com/dataprivacyio
Linkedin Connect https://www.linkedin.com/company/dpo-training-solutions
On The Web: https://data-privacy.io
YouTube Channel
Don’t forget to subscribe to our YouTube channel and get notified of updates. We post lots of fresh content regularly.
M. Perez, PEMEX, Mexico City (verified owner) –
Gracias
Pratod K, Riyadh (verified owner) –
Definitely recommend! A very useful tool with lots of great risk tracking and mapping features.
R.Ramirez, San Jose (verified owner) –
Highly recommend, easy to learn and use with examples, reports and features.
M. Richards, Chicago Stock Exchange (verified owner) –
Really like this template, easy to use with lots of automation features, mapping to other standards, tracking, reporting and samples to help you get up and going.